Skip to content

Final repository polish and README redesign - #92

Merged
fraware merged 6 commits into
post-freeze-developmentfrom
final/repository-polish-2026-08-25
Aug 25, 2026
Merged

fraware merged 6 commits into
post-freeze-developmentfrom
final/repository-polish-2026-08-25

Conversation

@fraware

@fraware fraware commented Aug 25, 2026

Copy link
Copy Markdown
Owner

Scope

Final software-repository pass before archival/maintenance mode on the post-freeze line.

This PR deliberately leaves empirical main and the frozen v8 physical-validation authority untouched.

Presentation and engagement

  • replaces the dense legacy README with a concise, visual project front door;
  • adds a direct live-experience CTA, workflow/license badges, the STRIKE → REVEAL → HEAR → PLAY → SHARE loop, a system diagram, capability maturity map, repository map, quick-start commands, research architecture, privacy boundary, and documentation index;
  • clearly separates the live frozen empirical application from post-freeze research/software capabilities;
  • keeps Sonic Twin, material, spatial, and Atlas claims within their currently earned maturity.

Final consistency cleanup

  • aligns root package metadata and contribution guidance with the repository's MIT license;
  • refreshes the claim registry for multi-source derivation provenance, Atlas V2 semantics, research-corpus governance, and the local Atlas client/API foundation;
  • refreshes the release checklist so it reflects the active rulesets and the Atlas API/client that now exist.

Defect found in the last pass

The merged Atlas conformance workflow was failing before any job started because its job-level condition used a context that is not valid there. The underlying Atlas packages were covered by the main/full-vision suites, but the dedicated lane itself was unusable.

This PR removes that invalid conditional and makes Atlas client/API typecheck + tests the actual conformance gate. A successful report remains explicitly scoped to local software contracts and records publicNetworkQualified: false.

Claim boundary

No empirical thresholds, acquisition semantics, er-dsp-2, evidence schemas, frozen Gate A/B/C contracts, or physical evidence are changed. No software result in this PR is presented as physical-object identity, material identity, microphone validation, human-perceptual validation, or public-network qualification.

fraware commented Aug 25, 2026

Copy link
Copy Markdown
Owner Author

Exact PR head 94559f8faa71d78a16e8c4922c7f30c437427eb9 is green on every lane triggered by this change:

  • CI 32852347723 — PASS, including typecheck, full tests, build, and browser smoke
  • full-vision software qualification 32852347729 — PASS
  • Atlas software-contract conformance 32852347793 — PASS

The dedicated Atlas lane had failed with zero jobs on the preceding merged revision; this PR repairs the workflow and proves that the Atlas client/API contract suite now executes successfully. Digital-twin qualification is path-filtered for PRs and will run on the resulting post-freeze-development push after merge.

@fraware
fraware merged commit 50acef8 into post-freeze-development Aug 25, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant